Groundcrew Sheet 13

13 · The mind

How robots fail and get fixed

Uptime maths, the ways real robots break, what warranties leave out, how service is sold, and who holds the parts, the diagnostics and the data.

26 min read5 figuresas of Sep 2026

A well-run industrial arm goes tens of thousands of hours between failures; an illustrative humanoid goes a few thousand, and a service robot's figure is not public at all. Warranties cover manufacturing defects and exclude the damage robots actually suffer, such as falls, collisions and spilled liquid. The maker holds the parts, the diagnostic software and the logs, so whoever fixes the robot works on the maker's terms. Those three facts decide whether a repair business in Southeast Asia can exist.

80,000h+mean time between failures claimed for a Fanuc armFanuc integrator, Oct 2024 · estimate
4,545hillustrative humanoid component-stack MTBF, about 189 days of 24/7 runningFirgelli via industry report · estimate
20daysUnitree's promise to ship a repaired part after it receives the broken one, Z1 armUnitree Z1 docs · verified
0multi-brand commercial service robot repair firms found in SG, MY or IDservice robots dossier · limited search

Three numbers: MTBF, MTTR and availability

Every service contract, every uptime guarantee and every insurance quote reduces to three numbers. A failure is any event that stops the robot doing its job until someone intervenes. The failure rate is how often that happens.

Real

MTBF (mean time between failures) is the average operating time between failures. MTTR (mean time to repair) is the average elapsed time from failure to working again, including waiting for someone to respond, travel, waiting for parts and the fix itself. Availability is the share of scheduled time the robot can work: MTBF ÷ (MTBF + MTTR). Uptime is the same idea measured after the fact.

ELI5

MTBF is how long your bike goes before a flat. MTTR is how long it sits in the shed until it is fixed. If you get a flat every 100 days and it takes 5 days to fix, your bike works 100 out of every 105 days, about 95% of the time. Making repairs faster helps as much as making flats rarer.

There is one trap in that formula. MTBF counts hours the robot runs; MTTR counts hours on the calendar. A robot that works one 10-hour shift five days a week and waits 20 days for a part loses 20 days of shifts, which is about 143 scheduled hours, rather than 480. The calculator below converts calendar repair time into scheduled hours lost, which is how a venue feels it.

FIG 13.1Availability calculatorInteractive
Reliability
Repair time on the calendar (MTTR)
Schedule
96.8%availability
85 hscheduled hours lost a year
0.6failures a year
500 hcalendar hours per repair
  • 1grey: waiting for a response
  • 2hatched: travel
  • 3orange: waiting for parts
  • 4white: hands-on repair
Claim: availability = MTBF ÷ (MTBF + scheduled hours lost per repair), and for robots whose parts come from China the parts wait dwarfs the repair itself. Try "Tray robot, part from Shenzhen" against "local spare": the same robot with the same failure rate goes from about 80% to about 99% availability. Presets are assumptions: the arm MTBF is an integrator claim, the humanoid MTBF is illustrative, the 20-day parts wait is Unitree's published turnaround, and no maker publishes MTBF for service robots, so the tray robot's 1,000 hours is a placeholder.

What 99% uptime means in hours

AvailabilityDown per year, 24/7 (8,760 h)Down per year, 10 h × 5 days (2,600 h)
99%87.6 h (3.7 days)26 h
99.4% (Weston Robot's claimed fleet uptime)52.6 h15.6 h
99.9% (the industrial bar)8.8 h2.6 h
99.99%53 min16 min

Real claims to hold against the table: Formic, which rents factory robots by the hour, reported 100,000 production hours at 99%+ uptime in Jun 2024 verified. Weston Robot in Singapore claims 99.4% fleet uptime vendor claim. Industrial buyers expect about 99.9%, while humanoid task success drops from about 95% in the lab to about 60% in the field estimate. That gap is a reliability problem as much as an AI problem.

The bathtub curve

Failures do not arrive evenly over a machine's life. Plot failure rate against time in service and you get the bathtub curve: a high rate at the start while design flaws and installation mistakes shake out, a low flat floor of random failures, then a rising rate as parts wear out.

FIG 13.2The bathtub curve with robot examplesSchematic, no scale
time in service failure rate Early failures Random failures Wear-out mapping, calibration design flaws in the field (Figure 02 forearm) falls, collisions, spilled liquid fouled sensors, tangled wheels controller-induced overheating reducer wear, battery fade squeegees, brushes next model ships: fleet retired before wear-out Figure 02, about 11 months
Claim: a robot's failure rate falls, flattens and then rises over its life, and each phase calls for a different service: fast fixes and design feedback early, repair capacity for random damage in the middle, scheduled part replacement late. Humanoid fleets turn over so fast (Figure 02 retired after about 11 months) that they may never reach the wear-out phase, which removes the long tail that third-party maintenance lives on elsewhere.

Where wear-out does arrive, makers already watch for it. Fanuc's ZDT (Zero Down Time) service connects 40,000+ arms, has prevented 4,000+ downtime cases, and detects reducer (gearbox) wear from motor torque "several weeks before actual failure" verified Jul 2025. That is predictive maintenance, run by the maker through its own cloud, on a data stream a third party with a laptop never sees.

How robots actually fail

An FMEA (failure mode and effects analysis) lists, for each part of a machine, how it can fail, what that does, how you would notice and how you fix it. The table below is FMEA-style: it uses field evidence from maker manuals and owner reports instead of scored ratings, because no maker publishes failure frequencies for service robots or humanoids.

SubsystemFailure modeEffectField evidenceWho fixes it
Localisationrobot loses its positionstops, asks to be pushed under a ceiling markerPudu manual verifiedvenue staff; maker support if self-test fails
Wheels and castershair, string, debris wrapstuck or drags, motor load risesPudu: check at least weekly verifiedvenue staff
Lidar and cameraslens fouled with dust or greaseabnormal running, stops mid-routePudu: clean weekly; Gausium same verifiedvenue staff
Batterydeep dischargebelow 2% the robot locks out; life shortens below 20%Pudu manuals verifiedvenue habit; pack swap by distributor
Emergency stoppressed or damagedrobot will not power onPudu manual verifiedvenue staff; part from maker if broken
Wi-Filoss of signalfleet cloud and lift calls dropPudu standard fault list verifiedvenue IT
Scrubber squeegee, brushesworn or wrappedwater trails, robot parked "waiting for service"Gausium guide unverifiedvenue or cleaning contractor
Humanoid joint motorwinding overheatsjoint or whole arm shuts offG1 owner reports, 2025 to 2026 verifiedcontroller change; else factory
Humanoid small gearswrist pitch gear breaks after violent motionjoint deadG1 EDU lab report, May 2025 verifiedfactory; opening voids warranty
Battery protectiontorque spike when switching policysudden full shutdown, robot fallsUnitree maintainer reply verifiedsoftware fix
Forearm wiringmoving cables and a distribution board in a hot, tight spacetop hardware failure point on Figure 02Figure, Nov 2025 verifiedredesign (Figure 03 removed both)
Arm reducergear wearprecision loss, then stoppageFanuc ZDT detects weeks ahead verifiedmaker service, scheduled

Read the right-hand column and a pattern appears. For wheeled service robots, most "failures" are hygiene and consumables that venue staff can handle: fouled sensors, tangled wheels, worn squeegees, tired batteries, lost localisation. Real hardware repair is a module swap, and modules come from the maker. For humanoids, the most common failures in public reports are induced by control software, and they show up as heat and broken small joints.

FIG 13.3Same ankle, two controllersHeat chain and joint temperature
controller gainsstiffness, damping, policy torque demandstiffer holds need more motor currenttorque tracks current copper heatgrows with current squared Same robot: Unitree G1 Same joint: ankle roll motor Same task: standing idle Time: 5 to 10 minutes Difference: 45 to 60 °C 20 °C406080100 90 °C warning stock Unitreecontroller GR00T whole-bodycontroller 30 to 45 °C
Claim: on the same G1 ankle, NVIDIA's GR00T whole-body controller drove both ankle-roll motors to the 90 °C warning within 5 to 10 minutes of standing, while Unitree's stock controller keeps them at 30 to 45 °C (GitHub issue, 2 Jun 2026). Heat comes from current, current from torque, torque from the controller, so the software you run decides the hardware's life.

Humanoids in the field

  • Figure 02 at BMW Spartanburg: 10-hour shifts Monday to Friday, 1,250+ hours of runtime, 90,000+ parts loaded, 30,000+ X3 cars, about 1.2M steps, and more than 99% placement success per shift verified Nov 2025. Figure reports "minimal hardware failures" and names the forearm as the top failure point. The fleet retired after about 11 months when Figure 03 launched. Whether the 1,250 hours is per robot or for the fleet is not stated: if per robot, it ran about half of roughly 2,350 scheduled shift-hours contested.
  • Agility Digit: 65,000+ operating hours at customers including GXO, Schaeffler, Amazon and Toyota Canada, and 100,000+ totes moved at one GXO site since Jun 2024 verified Sep 2026. Digit 5 claims more than 20 hours a day from a 90-minute battery and a 9-minute recharge claim.
  • Apptronik: about 22 hours a day of uptime under RaaS, "not yet validated at fleet scale" unverified.
  • UBTech Walker S2: autonomous battery swap in about 3 minutes, trials at BYD and Zeekr; no public failure or uptime data verified.
  • Unitree G1 owners: overheating shoulder motors with a heavier dexterous hand, broken wrist gears after violent learned policies, sudden shutdowns when a policy switch trips battery over-current protection verified. One lab could not send its robot back because of a research deadline and asked whether it could open the actuator itself.
Key insight

Two controllers on the same hardware differ by 45 to 60 °C at the ankle. The thermal limit of a small joint motor is the real ceiling on a cheap humanoid, and most of the public humanoid failures are caused by software that customers or labs wrote. Any service offer for humanoids has to include the controller, and the maker's warranty excludes exactly that case.

Warranties cover what rarely breaks

A warranty is the maker's promise to fix manufacturing defects free for a warranty period. An extended warranty buys a longer period. Read the exclusions and you find the business.

MakerPeriodExcludes
Unitreefrom day of receipt; length not stated on the terms pagefalls, "including tumble or fall when manipulating robot on level ground"; collisions; water, sand, ice or glass floors; damage in developer mode from custom programs; unauthorised disassembly. Customer pays shipping to Unitree verified
Puduvaries by country; Malaysian dealer offers 1 yearcollision, burning, water, oil, sand, overload, improper charging; "shell opening, and maintenance under unofficial guidance" verified
Gausium1 year from receiptcollisions and burns; water, oil and sand ingress; unauthorised modification verified
Keenonnot foundnot found

Three consequences. First, every excluded failure is paid repair, whoever does it, so demand for paid repair is structural. Second, the "shell opening" clause means an independent repairer cannot touch an in-warranty Pudu without voiding it: the in-warranty market belongs to whoever holds the distributor or authorised service contract. Third, Pudu sells extended warranties only while the original warranty runs verified, so the out-of-warranty base grows every month.

What warranties earn: US electronics sellers paid claims of 21% of recognised extended-warranty revenue by 2005 verified, old, and providers quote gross margins of 40 to 70% estimate. Those are consumer electronics that rarely fail. Restaurant and mall robots fail far more often, so treat those margins as a ceiling until someone measures robot failure rates.

How service is sold

After-sales is everything after the sale: repair, servicing, parts and updates. Chinese contracts call the maintenance-and-repair bundle maintenance and warranty service. The models below differ in who carries the risk of downtime.

ModelWhat the customer getsReal example
Break-fixpay per repairUnitree out-of-warranty service by purchase, robot shipped to Unitree verified
SLA tierspromised response time, fix time and visitsPUDU Care Standard, US and Canada only: 2-hour response, fixes "in as fast as 2 business days", 4 preventive visits, parts and labour included; price not public verified
Preventive maintenancescheduled visits, an inspection round, consumables replaceda US Pudu reseller makes its 1-year warranty conditional on a quarterly maintenance plan verified
Predictive maintenancefailures caught early from dataFanuc ZDT: 40,000+ arms, 4,000+ downtime cases prevented verified
RaaS bundlerobot, service and uptime for one monthly feeAgility Digit: US$8,500 a month plus US$25,000 deployment; Formic: hourly rate with 100% maintenance and guaranteed uptime verified; BellaBot about US$335 a month unverified
Remote first lineremote diagnosis from fault codes and logsGausium: reply within 1 to 4 hours by severity, 40% solved remotely, after-sales 13% of headcount (2022) verified
On-site servicea technician at the robotTennant for Brain Corp robots: 500+ technicians and partners, next business day if requested before 13:00 CT verified
Depot repairrobot or module goes to a workshop, or back to the factoryUnitree robots were shipped whole to Hangzhou until JD.com built 8 regional repair hubs, growing to 100+ technicians in 2026 verified
Advance replacementa working spare arrives before the broken unit leavesno maker in the research publishes this for service robots in Southeast Asia

Who delivers it matters more than the model. In Southeast Asia, distributors do the on-site work. Pudu's own page says "Distributors provide maintenance services to end-users, and Pudu Robotics provides free maintenance spare parts and technical support"; after warranty, the distributor pays for parts verified. Those distributors are small: Singapore's authorised Pudu distributor answers email at a coffee company's domain, Malaysia's was founded in 2022, and none publishes an SLA verified. The service level agreement a venue can actually get depends on that one company.

FIG 13.4From fault to fix, two waysTimeline in days
Todayrepair at factory repair at the factory, 20 days Friday 21:00 fault, wait for Monday ship out ship back about 29.5 days With spareslocal kit working again in about 1 day the broken module travels to the depot while the robot works 051015 days202530
Claim: for a robot whose modules are repaired in China, a local spare turns a month of downtime into a day, because the robot stops waiting for the part's round trip. Illustrative: the 20-day factory turnaround is Unitree's published figure, office-hours support comes from maker terms, and the 3-day shipping legs are an estimate.

Parts logistics

Spare parts are the chokepoint. No maker or Southeast Asian distributor publishes parts lead times verified absence. The published anchors are Unitree's 20 days after it receives the broken part, plus shipping both ways at the customer's cost, and Pudu's and Gausium's rules that replaced warranty parts belong to the maker and must go back. Unitree may scrap damaged battery packs. Pudu tells owners to store robots above 60% charge and top them up every 3 months verified.

Two kinds of stock matter. Wear parts (squeegees, brushes, casters, wheels) are cheap, predictable and fit a van. Modules (lidar, drive wheel assembly, battery pack, mainboard, joint actuator) are expensive, brand-specific and only come from the maker. Repair prices for these modules in China and Southeast Asia are not public. Batteries also ship under dangerous goods rules (see compute, wiring and power), and customs times for parts are not in the research. A local spares kit is the obvious fix, and its cost is capital tied up per brand per country.

Who holds the keys

Diagnostic software, firmware, fault logs and parts sit with the maker and its authorised service providers. Pudu runs a formal partner channel with its own Service Partner Platform, next to separate platforms for distributors and venues, and describes its service tools as "original factory diagnostic systems" verified. Weston Robot is Unitree's authorised Global Service Center for Singapore and Malaysia verified. For an independent repairer, the realistic way in is to become such a partner, which makes it a subcontractor on the maker's terms.

FIG 13.5The maker's fenceData and access map
The maker's fence Robotlogs, maps, faults Maker cloudlogs and imagesmaps, firmware, updatesdiagnostic tools(Pudu: servers in China) Distributor platformsales, stock, fleet view Service partner platformdiagnostics, repair steps Venue apptasks, status, reports Independentrepairersees symptoms andswapped modules only Venuedowntime, invoices EU Data Act:raw data only,no rival robot
Claim: the robot's logs go to the maker's cloud first, and the maker decides which portal sees what, so an independent repairer outside the fence gets symptoms and swapped modules while the partner inside gets diagnostics. Only the EU forces a path through the fence, and even that path excludes derived data. Schematic, modelled on Pudu's published platform structure.

Right to repair, status Sep 2026

LawWhat it gives a robot repairerDates
EU Right to Repair Directive 2024/1799makers must repair listed consumer goods; robots are not listed verifiedapplies from 31 Jul 2026
EU Data Act 2023/2854users can send connected-product data to a repairer of their choice; raw and pre-processed data only, derived data excluded; the data may not be used to build a competing product verified12 Sep 2025; design-for-access duty for products placed on the market after 12 Sep 2026
Minnesota Digital Fair Repair Actdocumentation, parts, tools and software on fair terms, including commercial equipment; plausibly covers service robots, no enforcement case found estimatein force 1 Jul 2024
Coloradoa broad digital electronic equipment law; scope for robots not checked unverifiedfrom 1 Jan 2026
Singapore and ASEANno robot right-to-repair or machine-data law found; PDPA covers personal data only unverifiedn/a

In Southeast Asia, your access to parts, diagnostics and logs depends entirely on the contract you sign with the maker or its distributor.

A failure log record, field by field

Here is what one record from a repair visit could look like. It is illustrative: the fields are the point.

{
  "robot":    {"type": "tray delivery robot", "serial": "SN-0412", "firmware": "v3.2.1", "hours": 6120},
  "site":     {"type": "restaurant", "city": "Kuala Lumpur", "floor": "tile, wet near kitchen"},
  "fault":    {"time": "2026-09-19T21:40+08:00", "code": "LOC-02", "symptom": "lost, stopped at table 12"},
  "response": {"reported": "21:42", "remote_triage": "21:55", "on_site": "next day 10:30"},
  "fix":      {"cause": "lidar window fouled with grease", "action": "cleaned, recalibrated", "part": null, "minutes": 25},
  "downtime_min": 770,
  "sensor_snapshot": "held in the maker's cloud, absent from this record"
}
FieldWho values itWhy
Model, firmware, operating hoursmaker, insurer, lessorwhich build fails; age and exposure; residual value of a financed robot
Site and floor typeinsurer, chain HQ, makerrisk grade by environment; which outlets are hard on robots
Fault code and symptommaker, repairercomponent statistics by market; triage scripts
Response timestampsvenue, insurer, lessorproof of SLA; pricing an uptime guarantee
Cause, action, part numbermaker product team, parts plannerdesign flaws; what to stock in the spares kit
Downtime minutesvenue, insurerwhat the failure cost; size of a claim
Sensor snapshot: camera, joint states, actionsrobot learning labsthe field a repair ticket lacks, and the only one labs pay for

The last row is the problem with selling failure data to AI labs. Physical Intelligence's π*0.6 learns from expert corrections during its own robots' autonomous runs, and Dyna's DYNA-1 uses a reward model that watches robot video and targets error-recovery data verified. Every one of those loops runs on the lab's own robots, with synchronised camera frames, joint states and actions captured at the moment of failure. A repair ticket that says "left wheel tangled, 21:40, table 12" carries none of that, and no public price for third-party failure logs exists verified absence. The buyers who do need the other rows are the people who price risk. China's insurers have insured 1,000+ robots with a total sum insured above ¥200M, and they price on hardware value because they have no failure-frequency data verified.

What third-party maintenance teaches

Third-party maintenance means an independent firm services equipment made by someone else. It has worked in three mature industries, and each one tells you something different about robots.

IndustryIndependent shareWhat made it workHolds for service robots?
IT hardwareabout US$1.2B of more than US$65B of spend, under 2% (2019); 50 to 70% cheaper than the maker verifiedhuge, standard, long-lived base; used-parts market; hardware runs without firmware updates; still took decadesweakly: robots change model every year or two and need the maker's cloud
Elevatorsindependents hold about 50% of service units, a smaller share by value; Otis service is 65% of sales and 91% of segment profit (2025) verifiedolder non-proprietary equipment and lower prices; modern controllers need maker-only tools unverifiedpartly: makers design the tools to keep the service
Medical imaging36% (2019) to 50% (2022) of US imaging service spend, US$4.29B verifiedmachines above US$1M with long lives; the FDA called third-party servicing "critical" in 2018no: a US$15,000 robot with a 3 to 5 year life is cheaper to replace
Forkliftsnot researched unverifiedauthorised dealers earn most of their margin on parts and serviceclosest analogue: be the dealer's service arm

The scale can be large once it works. Park Place Technologies and Service Express, the two big US IT maintenance firms, merged in Jan 2026 with Warburg Pincus as majority owner and Temasek as a significant minority, 3,000+ staff and 25,000+ customers verified; a reported US$2.8B debt package at about 7 times leverage implies roughly US$400M of annual earnings estimate. In China, JD.com is building the first large multi-brand robot repair network. Its engineers report misassembled parts that leave robots unable to stand verified Aug 2026.

Terms in this chapter

English中文 + pinyinELI5Real definition
Failure故障gùzhàngAnything that stops the robot doing its job until a person steps in.An event that ends a machine's ability to perform its required function until intervention. In service contracts, the definition (does a lost robot pushed back by staff count?) decides the MTBF and the bill.
Failure rate故障率gùzhàng lǜHow often the robot breaks, for example once every 1,000 hours of work.Failures per unit of operating time or per unit shipped per period; the inverse of MTBF for a constant rate. No maker publishes failure rates for service robots or humanoids as of Sep 2026.
MTBF平均无故障时间píngjūn wú gùzhàng shíjiānHow long the robot runs, on average, before something breaks.Mean time between failures: average operating hours between failures. A Fanuc integrator claims 80,000+ h for Fanuc arms; an illustrative humanoid component stack is about 4,545 h (estimates).
MTTR平均修复时间píngjūn xiūfù shíjiānHow long the robot sits broken, on average, before it works again.Mean time to repair: average elapsed time from failure to restored service, including response, travel, parts wait and hands-on repair. For robots repaired in China the parts wait dominates (Unitree ships repaired parts within 20 days of receipt).
Availability可用率kěyòng lǜThe share of the time the robot is supposed to work that it actually can work.MTBF ÷ (MTBF + MTTR), with repair time converted to scheduled hours lost. 99% at 24/7 is 87.6 hours down a year; 99.9%, the industrial bar, is 8.8 hours.
Uptime正常运行时间zhèngcháng yùnxíng shíjiānThe measured share of time the robot was working, the number a venue sees on its report.Observed operating time as a share of scheduled time, the after-the-fact counterpart of availability. Formic reported 99%+ over 100,000 production hours (Jun 2024); Weston Robot claims 99.4% fleet uptime.
Repair维修wéixiūFixing a robot that has broken.Restoring a failed machine to working order by adjusting, recalibrating or replacing parts or modules. For service robots, most hardware repair is a module swap with maker-supplied parts.
Maintenance and warranty service维保wéibǎoThe bundle deal: someone keeps the robot healthy and fixes it when it breaks.The contract line covering scheduled maintenance plus repair, in or out of warranty. In Chinese distributor contracts it is 维保, short for 维修保养 (repair and upkeep).
Servicing保养bǎoyǎngRoutine care, like a car's regular service: clean, check, replace worn bits.Scheduled upkeep that prevents failures: cleaning sensors, clearing wheels, changing brushes and squeegees, checking batteries and fasteners. Pudu tells owners to clean sensors and wheels at least weekly.
After-sales service售后shòuhòuEverything that happens after the robot is sold: fixing it, swapping parts, updating software, answering the customer's calls.Post-sale support: warranty repair, spare parts, preventive maintenance, software updates and uptime guarantees. In Southeast Asia distributors deliver it; Pudu supplies free parts and support during warranty and distributors pay for parts after. Otis earns 91% of segment profit from service, the model makers want to copy.
Warranty保修bǎoxiūThe maker's promise to fix manufacturing faults for free, as long as you did not break it yourself.A contractual promise to repair or replace defective products for a period. Robot warranties exclude the common damage: Unitree excludes falls even on level ground and developer-mode damage; Pudu and Gausium exclude collisions, liquids and debris.
Warranty period保修期bǎoxiū qīHow long the free-fix promise lasts, usually one year.The time warranty cover runs, usually from the date of receipt. Gausium: 1 year; Malaysia's Pudu dealer: 1 year; Pudu: varies by country; Unitree's terms page gives no length. Also said 质保期 (zhìbǎo qī).
Extended warranty延保yánbǎoPaying extra to keep the free-fix promise going after the first year.Purchased cover beyond the standard period. Pudu sells it only while the original warranty runs. Consumer extended warranties paid claims of about 21% of revenue (2005), a margin ceiling for robots, which fail more often.
Spare parts备件bèijiànReplacement pieces kept ready so a broken robot can be fixed quickly.Replacement components and modules held for repair. The chokepoint for service robots: brand-specific, maker-supplied, lead times unpublished, and replaced warranty parts must be returned to Pudu and Gausium.
Wear parts易损件yìsǔnjiànPieces that wear out with normal use and get replaced on a schedule, like brake pads.Consumable components with predictable life: squeegees, brushes, casters, wheels, filters. Cheap and generic enough to stock locally, unlike modules such as lidar or mainboards.
Return to factory返厂维修fǎnchǎng wéixiūSending the broken robot or part all the way back to the maker to be fixed.Depot repair at the maker's own facility. Unitree required robots to be shipped to Hangzhou at the customer's cost; the Z1 arm's repaired parts ship within 20 days of receipt.
On-site service上门服务shàngmén fúwùA technician comes to the robot instead of the robot going to the technician.Field repair at the customer's site. Tennant services Brain Corp robots next business day if requested before 13:00 CT; PUDU Care Standard includes unlimited on-site repairs in the US and Canada.
Remote diagnosis远程诊断yuǎnchéng zhěnduànWorking out what is wrong with the robot over the internet before anyone drives out.Fault analysis from telemetry, fault codes and logs through the maker's cloud. Gausium reported solving 40% of problems remotely (2022). Requires access to the maker's diagnostic tools.
Fault code故障码gùzhàng mǎA short error number the robot shows or sends when something goes wrong.A coded identifier for a detected fault (for example winding overheat on a joint, localisation lost, loss of Wi-Fi). Meaning tables usually sit in maker service documentation.
Log日志rìzhìThe robot's diary of what it did and what went wrong, written by the software.Timestamped records of events, states and errors. Service robots upload operation logs to the maker's cloud (Pudu stores them in China); a repairer outside the maker's partner programme usually cannot read them.
Service level agreement服务等级协议(SLA)fúwù děngjí xiéyìA written promise of how fast help arrives and how fast the robot gets fixed.A contract term fixing response time, repair time, coverage hours and penalties. PUDU Care Standard promises a 2-hour response in the US and Canada; no Singapore distributor publishes an SLA as of Sep 2026.
Authorised service provider授权服务商shòuquán fúwùshāngA repair company the maker has officially approved and given its tools and parts.A partner certified by the maker to repair its products with factory diagnostics, parts and warranty reimbursement. Pudu runs a Service Partner Platform; Weston Robot is Unitree's Global Service Center for Singapore and Malaysia.
Response time响应时间xiǎngyìng shíjiānHow long you wait between reporting a problem and someone starting to fix it.Time from fault report to first action (remote or on site). Gausium's rule: 1 hour for severe, 2 hours normal, 4 hours complex (2022); Pudu claims customer service replies within 15 minutes.
Inspection round巡检xúnjiǎnA regular walk-round check of every robot, like a nurse's ward round.A scheduled patrol inspection of deployed equipment to catch faults before they stop work: sensor cleanliness, wheel wrap, battery health, firmware version.
Preventive maintenance预防性维护yùfángxìng wéihùFixing things on a timetable before they break.Time- or usage-based upkeep. PUDU Care Standard includes 4 preventive visits a year; a US reseller makes Pudu's warranty conditional on a quarterly maintenance plan.
Predictive maintenance预测性维护yùcèxìng wéihùUsing the robot's own data to spot a part about to fail and replacing it just in time.Condition-based maintenance from telemetry. Fanuc ZDT connects 40,000+ arms, detects reducer wear from motor torque weeks before failure and has prevented 4,000+ downtime cases. Makers own this data loop.
Bathtub curveMachines break a lot when new, rarely in middle age, and a lot again when old. Drawn as a graph it looks like a bathtub.The failure rate over service life: decreasing early failures, a flat period of random failures, rising wear-out. Humanoid fleets may never reach wear-out: Figure 02 retired after about 11 months.
FMEAA table listing every way each part could break, what would happen, and how you would catch it.Failure mode and effects analysis: a systematic review of each component's failure modes, effects, causes, detection and severity, often scored as a risk priority number. Used in design reviews and service planning.
Third-party maintenanceAn independent company fixing machines made by someone else, usually cheaper than the maker.Independent servicing of other makers' equipment. IT hardware TPM is 50 to 70% cheaper than the maker but under 2% of spend (2019); imaging independents reached 50% of US service spend (2022); elevator independents hold about 50% of service units.
Right to repairLaws that make makers share parts, tools and manuals so you can get things fixed elsewhere.Legal duties on makers to supply parts, documentation, tools or data to owners and independent repairers. The EU directive (from 31 Jul 2026) does not list robots; the EU Data Act gives raw data access; Minnesota covers commercial equipment; nothing found in Singapore or ASEAN.
Advance replacementYou get a working spare first, then send the broken one back.A service model where a replacement unit or module ships before the failed one is returned, so downtime equals delivery plus swap time. Requires a local spares pool; no maker in the research publishes it for service robots in Southeast Asia.
Sources for this chapter
  1. Motion Controls Robotics, Fanuc ZDT and MTBF: motioncontrolsrobotics.com; Fanuc ZDT brochure: fanuc.co.jp
  2. Figure, production at BMW: figure.ai; Humanoids Daily, Figure 02 retirement: humanoidsdaily.com
  3. GeekWire, Agility Digit 5, 15 Sep 2026: geekwire.com; Agility, 100k totes: agilityrobotics.com; The Robot Report, Agility S-4: therobotreport.com
  4. CnEVPost, Walker S2 battery swap: cnevpost.com
  5. G1 owner reports: MYBOTSHOP forum, GR00T-WholeBodyControl #174, unitree_sdk2_python #129, unitree_rl_mjlab #14
  6. Pudu manual (FCC filing): fcc.report; Pudu support: pudurobotics.com/en/support; PUDU Care: pudurobotics.com/en/pudu-care; Pudu privacy policy: pudurobotics.com/en/privacy
  7. Gausium maintenance guide: gausium.com; Gausium Phantas manual: innovi.nl; Sina, Gausium service, 2022: sina.com.cn
  8. Unitree after-sales terms: unitree.com; Unitree Z1 service: dev-z1.unitree.com
  9. NVC Robotics pricing: nvcrobotics.com; Xtrike Robotics: xtrikerobotic.com; Jewel Robotics: jewelrobot.com; Weston Robot: westonrobot.com
  10. Brain Corp and Tennant service standards: braincorp.com
  11. Keji Ribao via 163.com, JD.com robot repair network, 19 Aug 2026: 163.com
  12. Robotics 24/7, Formic RaaS: robotics247.com
  13. Gartner TPM market guide (hosted): smart3rdparty.com; Park Place and Service Express merger: parkplacetechnologies.com; Octus on financing: octus.com
  14. AuntMinnie, imaging service spend: auntminnie.com; FDA servicing report, 2018: regulations.gov
  15. Otis 2025 annual report (10-K), service share and independents; elevator independents: elevatorinsight.io
  16. Warranty Week, extended warranty claims, 2005: warrantyweek.com
  17. arXiv, π*0.6 and Recap: arxiv.org; Dyna, DYNA-1: dyna.co
  18. EUR-Lex, Right to Repair Directive: eur-lex.europa.eu; Data Act: eur-lex.europa.eu; Minnesota law summary: fmjlaw.com; Colorado: cpr.org
  19. Shanghai municipal finance office, robot insurance and leasing policy: jrj.sh.gov.cn
  20. Groundcrew research dossiers, Sep 2026, built from the sources listed above.